The Challenge

A large-span commercial roof — a distribution warehouse, a retail centre, a factory shed — presents a waterproofing problem that has almost nothing to do with the open field of the roof.

The field is the easy part. The failures happen at the penetrations: rooflights, extraction fans, HVAC curbs, drainage outlets, and the perimeter upstand where the roof meets the parapet. On a 20,000 m² roof there may be several hundred of these details, and every one is a potential entry point.

Add thermal movement. A dark roof surface in a continental climate can swing from −20 °C in winter to +70 °C in summer. The deck expands and contracts underneath the membrane every single day. A waterproofing layer that cannot absorb that movement will eventually crack — usually at a seam, usually at a detail.


The System Specified

Layer Product Specification
Primer Bitumen primer Applied to cleaned, dry concrete deck
Base layer SBS Modified Bitumen Membrane 3 mm, polyester reinforced, PE film both faces
Cap layer SBS Modified Bitumen Membrane 4 mm, polyester reinforced, mineral granule surface
Details Polyurethane Waterproof Coating Liquid-applied at all penetrations and upstands


Why SBS, not APP.
SBS elastomeric bitumen stays flexible down to −25 °C. APP is the better choice in consistently hot climates. For anywhere with a real winter, SBS is the specification.


Installation Sequence

  • Deck preparation — surface cleaned, laitance removed, all sharp projections ground back. Any standing-water low spots corrected before membrane goes down.

  • Priming — bitumen primer applied and allowed to dry to a tacky finish.

  • Base layer — 3 mm membrane torch-applied, 100 mm side laps, 150 mm end laps, laid perpendicular to the fall.

  • Detail work — every penetration, upstand and outlet reinforced with a collar of membrane before the cap layer arrives, then dressed with liquid polyurethane coating.

  • Cap layer — 4 mm mineral-surfaced membrane, laid with seams offset a half-roll width from the base layer.

  • Flood test — outlets plugged, roof flooded, held 24 hours, inspected from below.


The Result

A two-layer system with liquid-reinforced details gives a roof that is continuous — no straight path from surface to deck anywhere on the roof, including at the several hundred points where something passes through it.

The mineral granule cap surface protects the bitumen from UV, which is the single largest cause of premature ageing in exposed bitumen roofing. Granule colour also reduces surface temperature slightly compared with a black finish.


Products Used

  • SBS Modified Bitumen Waterproof Membrane — 3 mm / 4 mm, polyester or fibreglass reinforced

  • Polyurethane Waterproof Coating — single or two-component

Other More

Basement Waterproofing with Pre-Applied Self-Adhesive Membrane

Basement Waterproofing with Pre-Applied Self-Adhesive Membrane

2026/09/07

The Challenge Below-grade waterproofing has one property that makes it fundamentally different from every other application: you cannot go back and fix it. Once the structure is poured and the excavation backfilled, the waterproofing layer is buried ...

HDPE Geomembrane Lining for Irrigation Reservoirs

HDPE Geomembrane Lining for Irrigation Reservoirs

2026/09/08

The Challenge An unlined earth reservoir in a region with permeable subsoil can lose a large share of its stored volume to seepage before any of it reaches a crop. In agricultural regions where water is the constraint on yield, that loss is the diffe...

From Enquiry to Container

Six steps, one point of contact. You will know what happens next at every stage — and who to ask if it does not.

Enquiry

Enquiry

Share the project, not just a product code — we recommend what actually fits.

Technical

Technical

Our engineers specify the full system and send data sheets for your contractor.

Samples

Samples

Samples first. Then a full quotation — price, loading and lead time.

Production

Production

Made on our own lines in parallel — nothing subcontracted.

Inspection

Inspection

Batch-tested and photographed before loading. Documents ready with the goods.

Shipping

Shipping

Tracking shared, documents couriered. We stay reachable after arrival.

flat roof waterproofing with sbs modified bitumen membrane-1

Get a Free Quote

Our representative will contact you soon.
Email
Mobile/WhatsApp
Name
Company Name
Message
0/1000